MSP Technologies

Engineering, Software and Production

Timesheet

Your details
Department and job title fill in when you select your name.
Loading options…
Total hours
0.00h

Enter hours on your time entries below

Standard overtime
0.00h

17:00–midnight or Sat AM

Premium overtime
0.00h

Night, Sat PM, or all Sunday

Entries
0

Rows with a date filled in

Time entries

Starts with 1 entry — duplicate, add, or remove lines as needed (up to 20).

Entry 1
No date selected

Scroll down for full instructions below.

Timesheet instructions
Submit daily when possible — reports are produced weekly on Monday.

Generic

  • Submit with at least one entry; you may submit multiple times per day.
  • Enter your name only — department and job title are added automatically.
  • Date format: DD/MM/YYYY.
  • For non-project work, select non project related and add detail in notes.
  • Hours in decimal at 15-minute intervals (e.g. 5.25 or 5.5).
  • Check on site if work was carried out on site.
  • Check overnight if you stayed overnight that day.
  • Enter total hours worked in Total Hours. Enter extra hours above your normal day in the overtime columns (e.g. 12 total, 4 standard overtime if your normal day is 8 hours).

Product department

  • Build ID: 4 digits (e.g. 0011).
  • With a build ID you do not need to select a project — it links automatically.
  • If your process is not in the dropdown, describe it in notes.

Engineering department

  • No build ID required — select via project.
  • Process selection is not required.